III. Operational Tests

Operational Tests

These tests are performed to determine whether the hydraulic system , safety systems and structural mechanisms are operating in a normal manner. Placed on a hard level surface, the aerial apparatus is taken through a sequence of operational cycles. Any abnormal condition will be noted.

The Inspection Report will document a detailed list of all components tested and inspected.

Areas of inspection are:

Operational Tests2

  1. Outriggers and Controls
  2. Turntables and Controls
  3. Platforms and Controls Structure
  4. Ladder Sections Components Structure
  5. Boom Components
  6. Complete Hydraulic Systems
  7. Interlock and Safety Systems